striping plans Tag

W-Trans is leading the team that prepared designs to restripe 2.8 miles of Mary Avenue with Class II bicycle lanes.  The work is currently in construction, and includes striping plans for the length of the project, modifications to vehicle and bicycle detection at 13 intersections,...

In 2011, W-Trans studied 17 corridors identified by the community where the feasibility of adding bike lanes was uncertain and road widening is considered infeasible.  The evaluation included confirming design assumptions with local and state transportation specialists followed by development of bike facility alternatives.  Such...