concept design Tag

The City of Rohnert Park had a capital project to install GTT Opticom GPS-based emergency vehicle preempt equipment at fourteen intersections, and W-Trans prepared the plans.  Due to the limited amount of electrical contracting work at each intersection, W-Trans suggested an abbreviated-format plan to reduce...

In 2011, W-Trans studied 17 corridors identified by the community where the feasibility of adding bike lanes was uncertain and road widening is considered infeasible.  The evaluation included confirming design assumptions with local and state transportation specialists followed by development of bike facility alternatives.  Such...