Projects

A Safe Routes to School plan was prepared for 14 public elementary schools in the City of Petaluma including observations at each school during the morning drop-off and evening pick-up periods, as well as meetings with principals, police and PTA members at each school to...

As part of our role in providing traffic engineering technical assistance to the City of Oakland, W-Trans evaluated four corridors to determine if any had a history of safety issues which would warrant a grant application for the Caltrans 2015 HSIP (Highway Safety Improvement Program)...

The Napa County Transportation Authority is currently constructing the Vine Trail between Redwood Road in the City of Napa and California Drive in the Town of Yountville.  The multi-use bicycle/pedestrian trail parallels State Route 29 and is situated in a closely-spaced corridor between the Napa...