Projects

As part of an on-call contract, Orinda staff asked W-Trans to audit timing at all City-owned traffic signal locations for conformance with current California MUTCD guidance.  W-Trans obtained timing sheets from City files and controller cabinets and verified the accuracy by spot checking values in...

A systemic safety analysis was prepared by W-Trans for the City of Sonoma in accordance with the Systemic Safety Analysis Report Program Guidelines developed by the Division of Local Assistance within Caltrans.  The process included collecting citywide collision data for the most recent five-year period,...