Creston Road Corridor Study (City of Paso Robles)

Creston Road Corridor Study (City of Paso Robles)

W-Trans is currently in the process of preparing the Preferred Plan for the Creston Road Corridor Study for the City of Paso Robles.  A multi-day workshop was held in May 2017 where several alternative geometric plans were presented.  The plan focuses on Complete Street principles to more fully serve pedestrian and bicycle users on the corridor and address safety conditions of school activity.  As part of the process, a demonstration project was installed to display a Class IV (protected) bike facility.  The study utilized traffic projections from SLOCOG’s Travel Demand Model.