W-Trans | Design
4
archive,category,category-design,category-4,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-16.7,qode-theme-bridge,wpb-js-composer js-comp-ver-5.6,vc_responsive
 

Design

W-Trans is leading the team that prepared designs to restripe 2.8 miles of Mary Avenue with Class II bicycle lanes.  The work is currently in construction, and includes striping plans for the length of the project, modifications to vehicle and bicycle detection at 13 intersections,...

As SMART rail initial testing began, Sonoma County staff noticed that two rail crossing locations had peak hour queues that frequently extended over the SMART tracks. W-Trans was hired to evaluate the expected safety of the crossings in the Penngrove and Fulton communities, and concluded...

The Napa County Transportation Authority is currently constructing the Vine Trail between Redwood Road in the City of Napa and California Drive in the Town of Yountville.  The multi-use bicycle/pedestrian trail parallels State Route 29 and is situated in a closely-spaced corridor between the Napa...